Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/25/2024 |
ENGR Engineering Final
|
|
Partial Pass |
TCO 2 only, the graded area and disturbed surrounding area needs to be cleaned up and covered with either a DG or similar covering to complete, hydro seed can also be done as well. The electrical trench needs to be completed and filled. The rough area in the concrete should also be filled at this time to protect students from any trip hazard. |
| 12/17/2024 |
ENGR Engineering Final
|
|
Passed |
Passed, ready to close out this permit. |