Inspection Status: Partial Pass
Inspection History
| Date |
Description |
Inspector |
Results |
Comments |
| 04/14/2026 |
|
|
Partial Pass |
Pedestrian connection to Sherwood Village Dr: layout is correct, addition of a ramp to achieve necessary slopes will require a handrail between landings when over 5% running. Okay to pour sidewalk. |
| 06/18/2026 |
|
|
Partial Pass |
Sidewalk forms at playground area are set up with proper slopes. Sub-grade still needs to be leveled and compacted. |
| 09/15/2026 |
|
|
Partial Pass |
Okay to pour sidewalks shown on sheet CS201 - pending dry weather conditions. |
| 12/24/2025 |
|
|
Partial Pass |
Contractor can pour the ramp going into the playground |