Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 02/25/2025 |
ENGR Engineering Final
|
|
Partial Pass |
The landscapes not completed still need to finish putting rip wrap on the east side of the new building and put rip more riprap on the north side of the baseball field or the erosion has occurred |
| 04/30/2025 |
ENGR Engineering Final
|
|
Passed |
|