Permit: TD-DEV-0423-00210

Parcel: 11309227A


Addresses:

2402 N 1ST AV

Inspection Status: Partial Pass

Inspection History: ENGR - Drainage Structures

Date Description Inspector Results Comments
03/19/2024 ENGR - Drainage Structures Partial Pass Trash enclosure footing
04/11/2024 ENGR - Drainage Structures Partial Pass rebar and grout on first 6 rows passed.
04/15/2024 ENGR - Drainage Structures Partial Pass enclosure walls and center gate post complete. prepping for enclosure floor and approach apron.
05/22/2024 ENGR - Drainage Structures Partial Pass installed with filter fabric. Ok for rock install.
08/30/2024 ENGR - Drainage Structures Not Ready The concrete was poured today along Grant Road and 1st for the missing sidewalk, this should be ready by this afternoon for pedestrian traffic once it sets.

Pictures have been provided for all the sidewalk and for the inspection point for the underground basin storage
09/10/2024 ENGR - Drainage Structures Passed