Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Partial Pass

Inspection History: COT - BASN - Drainage/Basin - Condition Inspection

Date Description Inspector Results Comments
02/03/2026 COT - BASN - Drainage/Basin - Condition Inspection Partial Pass Contractor is forming WHIA basins for each of these units and they are good in layout and slope. I’m going over the depth so they are 6 to 9 inches below the curb outlets per plan but they look good to start.