Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Partial Pass

Inspection History: ENGR Paving

Date Description Inspector Results Comments
03/17/2026 ENGR Paving Partial Pass 3/17/26 Subgrade density complies. ABC density complies. Slopes and drainage in 4" AB is correct. Curb reveals good and tack coat on curbs. Okay to pave 2" AC mix #2.

Send pictures of rough area in front of Refuse Enclosure and between RE and building smoothed.
04/07/2026 ENGR Paving Passed