Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/01/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | Inspections needed on development package are sidewalk inspection (before pour to look at forms, slope, and compaction) and engineering final Contractor will be calling underground utility inspections permit TC – UTL – 0526–00053. Contract will also need right of way permit. |