Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 08/04/2026 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
Precon meeting went well contractor is finishing up and hoping to be done for first day of school on Monday. Sidewalks look good ramps look good contractor is placing DG on disturbed areas and will be reseeding disturbed areas in the field. There's been some changes rip rap removed because there's no gutter on the roof no downspouts. they are pre-fabricated buildings. Fire took out the sprinklers. These changes/allchanges need to be submitted As-Builts to the permit. Schedule final inspections when ready. |