Inspection Status: Not Ready
Inspection History
| Date |
Description |
Inspector |
Results |
Comments |
| 08/18/2026 |
|
|
Not Ready |
|
| 11/04/2026 |
|
|
Partial Pass |
South of screen wall drain pipe looks good coming through footer per as built drawings. OK to backfill with bedding or screened native. Compact under footing. After backfilling both sides finish project per plan. Schedule Engineering final when complete. Prior to final schedule site consultation if needed. |
| 11/12/2026 |
|
|
Passed |
|