Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History
Permit Number - TD-DEV-0325-00076
Inspection Description -
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/21/2025 | Not Ready | Trenches are not wide enough for sleaves. They are less than 26”. 3 Lateral Sleaves @2” plus the clearance for bedding correctly is 26” per plan. |