Inspection Status: Not Ready
Inspection History: For trash and recycling enclosures
| Date |
Description |
Inspector |
Results |
Comments |
| 01/30/2025 |
For trash and recycling enclosures |
|
Not Ready |
Contractor has not installed the steel in for the footer they will reschedule. Do the overhead lines are not installed yet so I don’t know how long they’re gonna be over that trash inclusion |
| 01/31/2025 |
For trash and recycling enclosures |
|
Partial Pass |
Footing and bollard pass, environmental has been by and has approved the revision. |
| 02/03/2025 |
For trash and recycling enclosures |
|
Partial Pass |
Slab steel looks good and well supported. |
| 02/18/2025 |
For trash and recycling enclosures |
|
Partial Pass |
Contractor needs to put one more course on the trash enclosure walls |
| 02/25/2025 |
For trash and recycling enclosures |
|
Partial Pass |
contractors good for TCO level two needs to move all the construction material and finish the landscaping |
| 03/12/2025 |
For trash and recycling enclosures |
|
Passed |
|