Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/15/2026 | ENGR Engineering Final | Not Ready | Schedule inspections that are not finaled yet. Only inspections that have been finaled are drainage pipe and striping inspections. -EV charging is not complete and there is open trenching for electric connection to EV chargers in parking lot. -All Equipment, conex boxes, dumpsters and materials etc. associated with this permit need to be removed from site. -Filter Fabric or other BMP's need to be removed from all drainage grates/structures -Trees that are staked need to be staked correctly. This is shown in details on page 18 of DP. |