Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/05/2025 | ENGR Engineering Final | Partial Pass | See checklist items for details. This list is not necessarily comprehensive. It did determine that site was unready for ENG Final. |
|
| 06/11/2025 | ENGR Engineering Final | Passed | Missing Benches backordered. Expected installation date 6/20/25 |