Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/13/2025 | ENGR Engineering Final | Partial Pass | Contractor needs to walk the driveways and sidewalk areas and fix all the damage | |
| 06/11/2025 | ENGR Engineering Final | Passed | good for CofO |