Inspection Status: Not Ready
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 06/16/2025 |
PDSD Engineering Division Pre-Construction SITE |
|
Not Ready |
Contractor is going to reschedule for tomorrow |
| 06/17/2025 |
PDSD Engineering Division Pre-Construction SITE |
|
Partial Pass |
For the contractor to have the plants on site at all time right along with the permit and install the track out rock also for the contractor that all the inspections from special inspections need to be on site with a hardcopy |
| 07/03/2025 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
Informed the contractor he needed all the third-party testing her sidewalks, curb, and the road. And call out for any inspections as needed. |