Inspection History Details
Inspection Status: Partial Pass
Inspection History
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/04/2026 | Partial Pass | contractor go ahead and pour the curb in front of the building .and the curb for the entrance | ||
| 06/12/2026 | Partial Pass | Okay to pour curb along south edge of building. | ||
| Scheduled |