Permit: TD-DEV-0323-00183

Parcel: 136130060

Inspection Status: Partial Pass

Inspection History

Date Description Inspector Results Comments
06/04/2026 Partial Pass contractor go ahead and pour the curb in front of the building .and the curb for the entrance
06/12/2026 Partial Pass Okay to pour curb along south edge of building.
06/18/2026 Partial Pass ok to pour the curb on the west side and south side.
07/07/2026 Partial Pass Sidewalk forms along North side of building: sub-grade, slopes, & dimensions look okay. Good to pour.
08/19/2026 Partial Pass Refuse enclosure subgrade is good. Instructed superintendent to use #4 rebar for the slab and 'Refuse Enclosure' for the inspections. Next inspection will be slab reinforcement prior to pour.
08/27/2026 Partial Pass Valley gutter forms are set up correct. Slope, depth, dimensions, and compaction are good. Okay to pour.
09/11/2026 Not Ready Fix for sidewalk scuppers not ready. 4" depth down and to sides of scupper walls needed for pour. Reschedule this when ready and also pre grout wall inspections for the west wall.
09/17/2026 Partial Pass Scuppers are fixed.