Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit: TD-DEV-0323-00183

Parcel: 136130060

Inspection Status: Partial Pass

Inspection History: ENGR Paving

Date Description Inspector Results Comments
09/03/2026 ENGR Paving Partial Pass 9/3/26
Main entryway driveway from golf links to parking lot subgrade compacted. I measured the depths with string line and it needed some adjustment contractor will send pictures of Subgrade finished and cleaned up and recompacted before placing AB..OK to place AB pending pictures.
09/08/2026 ENGR Paving Not Ready AB is not consistent enough for paving. There areas over 1" and many +.5" from 4".
When AB is within a half inch, it will be ready.