Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/17/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | Went over aspects of the DP all good. One change is Bollards in front of store will be placed in the asphalt for Clearance in pedestrian sidewalk area. 24' two way PAAL minimum width will be maintained. Schedule inspections under the DP permit number. Schedule Refuge Enclosure inspections when footer is dug and reinforcing ready. Schedule Ballard footing inspection when ready. Striping inspection when parking space striping is done. Flat work/sidewalk inspection one forms for sidewalk ramp ready. |