Inspection History Details
Inspection Status: Partial Pass
Inspection History: For trash and recycling enclosures
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/30/2026 | For trash and recycling enclosures | Partial Pass | Okay to pour footers of Refuse enclosure and bollards. When building wall in single lift expose verts at floor (weep holes) on inside for pregrout inspection. Schedule inspection for rebar in floor when ready. |
|
| 05/06/2026 | For trash and recycling enclosures | Partial Pass | Wall has been built to top. Weep holes good, bond beam in correct except the rebar ends need to be duct taped at the expansion joint before grouting.. Send picture of this before grouting. Schedule inspection for floor/apron when ready with rebar mat. | |
| 05/11/2026 | For trash and recycling enclosures | Not Ready | Slab reinforcing not ready. Contractor got compaction test that complied but 3rd party geo wants a proctor. Reschedule when ready. | |
| 05/14/2026 | For trash and recycling enclosures | Not Ready | 3rd party Geo testing cannot get consistent compaction result of 90% or greater. Contractor will scarify the AB let it dry and recompact. If weep holes are covered by floor then Schedule another pregrout inspection so we can witness correct vibration of grout reinforcing when grouting walls. | |
| 05/20/2026 | For trash and recycling enclosures | Partial Pass | Proctor was incorrect. Compaction tests came back good after corrected. Reinforcing needs to be 3" clear the dirt. On left, east side of apron this needs to be correct with more dobies or by cleaning some more dirt out to get clearance. otherwise reinforcing correct. Forms, slope and expansion material correct. Okay to pour floor and apron after I receive good pictures with clearance correct. Schedule next inspection when enclosure complete. |
|
| 05/29/2026 | For trash and recycling enclosures | Passed |