Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/01/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | Construction has started. Went over inspections and trash enclosure specs. This trash enclosure is different than our specs in several ways. 8' walls with a roofed storage area behind it. SWPPP board not installed, track pad has the wrong material. Heavy track out noticed on the TMC One parking lot needs to be cleaned up. Gates were swung in a direction that impacted traffic to the TMC site. |