Inspection History Details
Inspection Status: Partial Pass
Inspection History: SITE - Sign Footer/Setback/Excavation Layout/Rebar
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/19/2025 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | Partial Pass | Clearance bars' (2X) footers are set up correctly. Need to be free of standing water, then okay to pour. | |
| 09/25/2025 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | Passed | Footing for both menu boards: rebar cage is good, anchor bolts are good, electrical conduit is good. Okay to pour footers. All 13 light pole bases have ground rods installed. |