Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - TD-DEV-0224-00058
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/09/2026 | ENGR Engineering Final | Not Ready | ||
| 01/15/2026 | ENGR Engineering Final | Partial Pass | OK for level 2 TCO. Staff Training is OK/no public. temporary fencing or snow fencing will need to separate parking training staff from construction areas. Safety must be maintained. Construction materials and heavy equipment must be separated by temp fencing from staff. Spotters must be used if any equipment needs to be used in areas for staff parking or public area. |
|
| 01/22/2026 | ENGR Engineering Final | Not Ready | ||
| 01/30/2026 | ENGR Engineering Final | Re-inspection required | Reschedule inspection when root barriers are correct and complete sand seal in front of scupper is repaired. | |
| ENGR Engineering Final | Scheduled | |||
| 12/29/2025 | ENGR Engineering Final | Not Ready | contractor needs to finish all his landscaping, rip rap striping handicap, parking signs and remove all construction material. That’s on site. |