Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Requested
Inspection History: For trash and recycling enclosures
Permit Number - TD-DEV-0224-00058
Inspection Description - For trash and recycling enclosures
Inspection Status - Requested
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| For trash and recycling enclosures | Requested | |||
| 01/09/2026 | For trash and recycling enclosures | Not Ready | Kane bolts holes drilled and slab need to be fixed with pipes, inserted into holes and doors need to function in open and close positions. Bollards need to be filled with concrete and finished. | |
| 08/04/2025 | For trash and recycling enclosures | Partial Pass | 08/04/25, footing is good to pour, bollards still need to be seen prior to pour. | |
| 08/12/2025 | For trash and recycling enclosures | Partial Pass | Contractor, good to grout the trash enclosure, the first 4 feet. Next inspector comes out to inspect this needs to note that there’s a drainage in this trash enclosure. The plants before inspecting it. | |
| 08/18/2025 | For trash and recycling enclosures | Failed | Contractor installed wire mesh for the floor for the trash enclosure. I failed. It formed him that he needed number four bars on a 1 foot center Square. | |
| 08/20/2025 | For trash and recycling enclosures | Partial Pass | 08/20/25, This needs to be reinspected by Martin as the pictures were sent to him. 08/20/25, grout to the 6' mark. |
|
| 08/21/2025 | For trash and recycling enclosures | Partial Pass | Contractor can grout the last 2 feet of the wall for the trash enclosure. This trash enclosure walls are 8 foot tall tall. |