Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel: 13213120G


Addresses:

3520 S KINO PW


Inspection Status: Not Ready

Inspection History: Final inspection to ensure all landscape and water harvesting SITE

Permit Number - TD-DEV-0224-00058

Inspection Description - Final inspection to ensure all landscape and water harvesting SITE

Inspection Status - Not Ready

Date Description Inspector Results Comments
01/09/2026 Final inspection to ensure all landscape and water harvesting SITE Not Ready Bio Retention areas need to be depressed per landscape drawings. Also Landscape areas along MLK are at grade with Hardscape and need to be lowered.. This was discussed with contractor and he will be addressing these areas.
01/15/2026 Final inspection to ensure all landscape and water harvesting SITE Not Ready Bio retention areas are not sufficiently depressed. They have just little channels between the curb cuts. These channels need to be at least widened and areas of the bio retention islands that don’t have the channels. Also need to be depressed in order to infiltrate water. You don’t need to dig out the trees, but areas in these islands that can be depressed. Need to be depressed. The notes in the landscaping say all landscaped areas should be 2 inches below sidewalk or paved areas.
01/21/2026 Final inspection to ensure all landscape and water harvesting SITE Passed