Inspection Status: Partial Pass
Inspection History: SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 08/20/2025 |
SITE |
|
Partial Pass |
Inspection for grading for asphalt and concrete. Compaction testing is yet to done. 95% results are required on all sub-grade. All areas of sub-grade are sloped correctly in accordance with approved plans. The South end of the parking lot, according to the plans, will end in a 6" curb on the low side of the watershed, there will need to be some means to allow the water to flow out without eroding the earth. |
| 12/02/2025 |
SITE |
|
Passed |
Water harvesting areas are complete and in accordance with approved plans. |