Inspection Status: Partial Pass
Inspection History
| Date |
Description |
Inspector |
Results |
Comments |
| 09/03/2025 |
|
|
Partial Pass |
Concrete valley gutter is poured to detail specifications. Curbing is in place. Any areas where drainage meets dirt will need effective stabilization to prevent erosion. |
| 09/25/2025 |
|
|
Partial Pass |
AB inspection for paved areas: AB is at proper depth and elevations. Pending compaction test results (100%), okay to lay AC. |
| 10/07/2025 |
|
|
Partial Pass |
Sidewalk, paving, and striping are good. Swale is good. First few inches along East side of building needs to slope away from the building. Area where parking lot discharges water need stabilized to prevent erosion. |
| 10/21/2025 |
|
|
Passed |
10/21/25 - All sidewalks and flat work is complete in accordance with approved plans. Finish conditions are within acceptable tolerances. Slopes and cross-slopes are correct and in compliance with ADA standards. |