Inspection Status: Partial Pass

Inspection History

Permit Number - TD-DEV-0224-00047

Inspection Description -

Inspection Status - Partial Pass

Date Description Inspector Results Comments
09/03/2025 Partial Pass Concrete valley gutter is poured to detail specifications. Curbing is in place. Any areas where drainage meets dirt will need effective stabilization to prevent erosion.
09/25/2025 Partial Pass AB inspection for paved areas: AB is at proper depth and elevations. Pending compaction test results (100%), okay to lay AC.
10/07/2025 Partial Pass Sidewalk, paving, and striping are good. Swale is good. First few inches along East side of building needs to slope away from the building. Area where parking lot discharges water need stabilized to prevent erosion.
10/21/2025 Passed 10/21/25 - All sidewalks and flat work is complete in accordance with approved plans. Finish conditions are within acceptable tolerances. Slopes and cross-slopes are correct and in compliance with ADA standards.