Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR - Drainage Structures
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/03/2023 | ENGR - Drainage Structures | Not Ready | Starbucks with drive-through. Post address. Contain all materials within site. | |
| 09/26/2023 | ENGR - Drainage Structures | Partial Pass | Both trash enclosure footings | |
| 10/26/2023 | ENGR - Drainage Structures | Partial Pass | pre-grout Tony | |
| 11/27/2023 | ENGR - Drainage Structures | Not Ready | ||
| 11/28/2023 | ENGR - Drainage Structures | Not Ready | bollards not installed | |
| 12/01/2023 | ENGR - Drainage Structures | Partial Pass | trash enclosure apron Tony |
|
| 12/14/2023 | ENGR - Drainage Structures | Partial Pass | Curb installations in progress | |
| 12/18/2023 | ENGR - Drainage Structures | Partial Pass | this is for solid waste enclosure apron. | |
| 12/19/2023 | ENGR - Drainage Structures | Passed | Trash enclosure apron. Tony. |