Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - TD-DEV-0223-00141
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/11/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | Completed Pre- Construction meeting with Project Manager Thomas Barrett with Wallcon (480) 341-1444 reviewed site plan locations for the water harvest locations, rip rap areas which require grouting per approved plan, trash enclosure location and dimensions 28’ x 12’ x 6’ and verified the bollard locations which match the COT requirements. Instructed Thomas to call in his Storm Water inspection every (2) weeks for the entirety of project and let him know that Brian Benendon will be his COT site inspector. Reviewed NPPO plan requirements and the trees on site that were designated for (PIP) and (TOS) and they have been destroyed in grubbing process and Wallcon main office personnel are working with COT for the new requirements for this situation. |
|
04/19/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | superintendent Tom post address and SWPPP permit information. Provide Stormwater controls as needed. Schedule regular stormwater follow up in. Keep all materials contained within the site. Schedule site inspections for underground, stormwater, piping and trash enclosure. Also water harvesting, landscaping and accessibility. Schedule utility and building inspections from your combination permit. Contact Ernie Stevens for special inspections as needed. |