Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: For trash and recycling enclosures
Permit Number - TD-DEV-0223-00141
Inspection Description - For trash and recycling enclosures
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/07/2025 | For trash and recycling enclosures | Partial Pass | contractor is working on the walls for the trash enclosure needs to install the bond be at the top and then grout it contractor will call us when ready for grout. Contractor also needs to knock out. We pull at the bottom so we can see the grout come out at the bottom. | |
01/08/2025 | For trash and recycling enclosures | Partial Pass | Good to support the retaining walls in the front footer | |
02/05/2025 | For trash and recycling enclosures | Passed | Contractor needed me to look at some curb on the north end of the building. Good to pour. | |
08/16/2024 | For trash and recycling enclosures | Not Ready | The trash enclosure from outside the outside on the rear wall is only 20‘8“ and is not per our approve standards. The contractor has poured the footers as directed by either the owner or the Engineer of rRcord even though it is not of the proper size. I will contact the Engineer and advise him that he’s going to have to submit and get approved drawings prior to them building any of the walls for this structure or they can remove what they have poured and redo it |