Inspection History Details
Inspection Status: Partial Pass
Inspection History
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/10/2025 | Partial Pass | Discussed upcoming pccp | ||
| 03/18/2025 | Partial Pass | Contractor continue to work on the sidewalk and sidewalk scupper West End of the entrance to the building | ||
| 04/03/2025 | Passed | |||
| 06/16/2026 | Partial Pass | Ok to pour the curb on the west side driveway. | ||
| 07/10/2026 | Partial Pass | Contractor has prepared subgrade and ABC for PCCP driveway apron at east side of gate at wall separating the buildings. He will be pouring this at 8" as well as the drive lane going north on the west side of wall and all the parking spaces with 6" just west of the wall up to Glenn. Detail in DP calls for 95% compaction of Subgrade and 1" ABC for leveling and 6" class-B min concrete with no reinforcement. Contractor will use #4 mat at 2' OC. pictures of correct clearances from dirt will be provided. Expansion joint material will be used at cold joints. Curb reveals good. Okay to Poor this PCCP. Submit compaction reports to the portal. There are 2 curb ramps down to landing- adjacent to access aisle for handicap parking that will be poured. Slopes and forms are good. Ok to pour curb ramps and landing. |
||
| 07/21/2026 | Partial Pass | Vertical curb along East and South walls over to Refuse Enclosure of site are correct with additional reinforcement. PCCP west of new building is correct with additional reinforcing. Spacing, forms, expansion material correct. Dowels in place at joint. Okay to pour these curbs and PCCP. | ||
| 10/10/2024 | Partial Pass | Contractor pouring for curb and gutter to build the project they good to pour |