Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR - Drainage Structures
Permit Number - TD-DEV-0223-00141
Inspection Description - ENGR - Drainage Structures
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/19/2024 | ENGR - Drainage Structures | Not Ready | Contractor requesting building footing inspection. Tom was informed that he needs to schedule inspections from his combination permit and contact Ernie Stevens for special inspections as needed. | |
08/15/2024 | ENGR - Drainage Structures | Partial Pass | Contractor can pour the footing for the basin walls | |
08/15/2024 | ENGR - Drainage Structures | Partial Pass | Contractor can pour the footing for the basin walls | |
08/21/2024 | ENGR - Drainage Structures | Partial Pass | Contractor can grout the 54 inches of retaining wall | |
10/10/2024 | ENGR - Drainage Structures | Partial Pass | There is a bond beam at the bottom of the trash enclosure. They need a bond beam at the top. Knock out holes need to be cut at the bottom to see the rebar and to see the grout weep out through the holes. The retaining wall footer at the east end of the building is ready. Compaction testing needs to be on site for the retaining wall. |