Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/06/2025 | ENGR Engineering Final | Passed | ||
| 11/15/2024 | ENGR Engineering Final | Not Ready | We need to meet onsite, too many items missing such as; Long term and short term bicycle storage. Island in the middle of the parking spaces to the west Parking missing to the east Etc. |
|
| 11/18/2024 | ENGR Engineering Final | Partial Pass | Dave Roberts started this inspection. They have a revised set of plans with changes that will need to be submitted for review and approval. |