Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel: 13215005B


Addresses:

710 E EVANS BL


Inspection Status: Partial Pass

Inspection History: PDSD Engineering Division Pre-Construction SITE

Permit Number - TD-DEV-0223-00137

Inspection Description - PDSD Engineering Division Pre-Construction SITE

Inspection Status - Partial Pass

Date Description Inspector Results Comments
10/12/2023 PDSD Engineering Division Pre-Construction SITE Partial Pass Walked site with Field contact Joe Kidd will call in Swpp inspection every 2 weeks and will review exterior chain link fence location after construction starts after the 30th of October.
10/27/2023 PDSD Engineering Division Pre-Construction SITE Passed