Inspection Status: Not Ready
Inspection History: ENGR - Drainage Structures
Permit Number - TD-DEV-0223-00134
Inspection Description - ENGR - Drainage Structures
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/29/2023 | ENGR - Drainage Structures | Not Ready | This Inspection is mainly for the Trash Enclosure or Concrete items with rebar in them and no other item on this site. The Contractor is working on this site, has been Grading and Paving the Parking Lot. They have also completed the Trash Enclosure not per our Approved Standards so they will have to seek Approval from Andy Vera from Environmental Services. They will also have to provide this Department with a Certified signed Letter that has been Stamped and Sealed by the Engineer of Record for all work that has been complete without Inspection. They need to call in the Stormwater Follow-up Inspection every 2 weeks as discussed in the past till all work is complete per the Approved Plans or the Approved Revised Drawings. |
|
11/15/2023 | ENGR - Drainage Structures | Partial Pass | Engineer of record to provide stamped letter approving trash enclosure footing, and horizontal and vertical rebar prior to recall of inspection. | |
12/05/2023 | ENGR - Drainage Structures | Partial Pass | Letter from Engineer of Record will be needed for trash enclosure prior to recall of inspection. | |
12/12/2023 | ENGR - Drainage Structures | Passed |