Inspection History Details
Inspection Status: Not Ready
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2026 | PDSD Engineering Division Pre-Construction SITE | Not Ready | Per conversation, will email SWPPP requirements. | |
| 11/02/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | Inspections needed for project: Grading Paving Refuse enclosure Bollards Striping Signage Landscape appearance and function Landscape irrigation Sidewalk/flat work -Put SWPPP BMP’s in place and schedule stormwater initial inspection. Get utility permit. |