Inspection Status: Not Ready
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 05/12/2025 |
PDSD Engineering Division Pre-Construction SITE |
|
Not Ready |
Call Dr. go to reschedule pre-con |
| 05/15/2025 |
PDSD Engineering Division Pre-Construction SITE |
|
Not Ready |
Talk to the contractor this morning. He’s not gonna be on site this morning. He needs to reschedule for tomorrow. |
| 05/21/2025 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
Contractor, good to start. The project project is to build a playground some sidewalk little bit of curb and rip wrap and catch basin. |