Inspection Status: Complete (Recurring)
Inspection History: SITE - Stormwater Follow-up
Permit Number - TD-DEV-0125-00001
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Complete (Recurring)
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/07/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | over laps on wattle need to be changed to be side to side not on top of each other. I have also approved of the by-weekly being called in every 21 days. | |
| 05/28/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | Please get a sweeper out here to clean out to and the main road. | |
| 06/18/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | Minor track out going onto Santa Cruze, please continue sweeping this area. | |
| 07/09/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | SWPPP measures are being maintained well. Better protection of street drain is advised. | |
| 07/30/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | Site is in good condition, sediment and track out are contained properly. Street drain near entrance of site in public ROW has sediment buildup but it does not appear to be coming from this site. | |
| 08/20/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | Site is in good condition. | |
| 09/23/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | Site is in good condition overall, there is one area of wattle on the West border, South of the trailers, that needs to be corrected. | |
| 10/29/2025 | SITE - Stormwater Follow-up | Passed | Site is in good condition. |