Parcel: 10704002C


Addresses:

1401 W GLENN ST


Inspection Status: Partial Pass

Inspection History: SITE - Stormwater Follow-up

Permit Number - TD-DEV-0123-00124

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Partial Pass

Date Description Inspector Results Comments
05/02/2024 SITE - Stormwater Follow-up Partial Pass
05/31/2024 SITE - Stormwater Follow-up Partial Pass
08/02/2024 SITE - Stormwater Follow-up Complete (Recurring) There are no concerns on this project at this time, I met with the contractor to discuss future changes. They have submitted plans to be reviewed and revised for some of the exterior walkable areas around the building. They have questions about some of the rollup doors and drive-through‘s if they may need some of the parking blocks to be removed so that vehicle access is allowed into those doorways. I advised them this information will be provided during the review of the revision.
08/29/2024 SITE - Stormwater Follow-up Complete (Recurring) The contractor continuing to work on the water harvesting area and the basin area
09/19/2024 SITE - Stormwater Follow-up Complete (Recurring) Contractor needs to clean out the basins and the channels that run into the basins area. Contractor also is Grady in the front for the parking lot and sidewalk. No concerns at this time grading on the grading for the parking lot.
09/27/2023 SITE - Stormwater Follow-up Partial Pass No concerns at this time
10/09/2024 SITE - Stormwater Follow-up Partial Pass contractor is forming up for sidewalk on the east end of the building, running all the way to flowing Wells. And place a grip wrap along the fence area on the south end of the building. The catch bitch sitting on the southwestern of the building has rip rap.
10/23/2024 SITE - Stormwater Follow-up Complete (Recurring) No concerns on the stormwater biweekly everything still in place
11/05/2024 SITE - Stormwater Follow-up Complete (Recurring) Everything looks good as of today, so there’s no concerns
11/07/2024 SITE - Stormwater Follow-up Passed
11/15/2023 SITE - Stormwater Follow-up Partial Pass