Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/07/2024 | ENGR Engineering Final | Partial Pass | Contractor needs to complete in placing the DG along the roadway on the West End | |
| 12/02/2024 | ENGR Engineering Final | Passed |