Inspection Status: Partial Pass
Inspection History: SITE - Sign Footer/Setback/Excavation Layout/Rebar
| Date |
Description |
Inspector |
Results |
Comments |
| 02/20/2025 |
SITE - Sign Footer/Setback/Excavation Layout/Rebar |
|
Partial Pass |
Light poles, rebar, 20' #2 ground wire, and conduit for electric pass on 02/20/25 pass and good to pour |
| 02/25/2025 |
SITE - Sign Footer/Setback/Excavation Layout/Rebar |
|
Not Ready |
Slab pitch wrong, side to side more than 3” must pitch to front 1.5% |