Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel: 13728107B


Addresses:

991 W MELRIDGE ST


Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Permit Number - TD-DEV-0123-00111

Inspection Description - PDSD Engineering Division Pre-Construction SITE

Inspection Status - Passed

Date Description Inspector Results Comments
10/07/2025 PDSD Engineering Division Pre-Construction SITE Passed Pre-Construction meeting was held on-location with Site Inspector, Project Superintendent, and Grading Contractor. Areas that will need Site Inspections include: grading, sidewalks, paving, dumpster enclosure, walls, landscape, irrigation, and water harvesting. Advised that SW Gas should be consulted in regard to proximity of underground gas line to parking lot and excavation. Okay to proceed with clearing and grading.