Inspection History Details
Inspection Status: Not Ready
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/14/2023 | PDSD Engineering Division Pre-Construction SITE | Not Ready | contractor removed six eucalyptus trees. Inform the contractor that he needs to call Lynn every two weeks for inspections |
|
| 09/11/2023 | PDSD Engineering Division Pre-Construction SITE | Partial Pass | inform the contractor to call in every two weeks for inspection | |
| 10/16/2023 | PDSD Engineering Division Pre-Construction SITE | Not Ready | Construction is under way, pre-construction was never completed | |
| 11/15/2023 | PDSD Engineering Division Pre-Construction SITE | Passed |