Inspection Status: Not Ready
Inspection History
| Date |
Description |
Inspector |
Results |
Comments |
| 06/23/2025 |
|
|
Not Ready |
Running slope of sidewalk in front of building is greater than 5% (7% over 16ft), this necessitates a handrail per ADA requirements. |
| 06/27/2024 |
|
|
Not Ready |
Gates are locked contractor need to reschedule. Nobody’s on site. |
| 06/28/2024 |
|
|
Partial Pass |
|
| 08/22/2025 |
|
|
Not Ready |
DP As-Built approval required prior to inspection closeout. |
| 12/18/2024 |
|
|
Partial Pass |
Side walks are not completed yet but what is looks good. Sidewalk is completed from fence line to ADA parking. |