Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/03/2024 | ENGR Engineering Final | Partial Pass | The handicap parking is not compliant. Contractor has not installed the handicap signs. | |
| 07/10/2024 | ENGR Engineering Final | Partial Pass | contractors good for TCO #4 Need to finish the striping for the handicap, parking the handrails leading up to the entrance and remove the fence, the dumpster, and the Porta, Johns, and all construction material off the sidewalk |
|
| 07/24/2024 | ENGR Engineering Final | Passed |