Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - LCPL - Sewer
Permit Number - TC-UTL-1024-00091
Inspection Description - COT - LCPL - Sewer
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/21/2025 | COT - LCPL - Sewer | Re-inspection required | 7-21-25: not connected. Contractor will schedule n inspection when connected and under test. | |
| 08/01/2025 | COT - LCPL - Sewer | Re-inspection required | 8/1/2025 courtesy inspection all all items that need to be done. Contractor is aware of the requirements prior to inspections. | |
| 08/14/2025 | COT - LCPL - Sewer | Partial Pass | 8-14-25: sewer connection verified under test. DWV under manufactured home must be secured/strapped to where it is not lying on the ground. 1/4" slope for every 1' is required and will be verified prior to final inspection. |