Inspection Status: Re-inspection required
Inspection History: COT - LCPL - Sewer
| Date |
Description |
Inspector |
Results |
Comments |
| 07/21/2025 |
COT - LCPL - Sewer |
|
Re-inspection required |
7-21-25: not connected. Contractor will schedule n inspection when connected and under test. |
| 08/01/2025 |
COT - LCPL - Sewer |
|
Re-inspection required |
8/1/2025 courtesy inspection all all items that need to be done. Contractor is aware of the requirements prior to inspections. |
| 08/14/2025 |
COT - LCPL - Sewer |
|
Partial Pass |
8-14-25: sewer connection verified under test. DWV under manufactured home must be secured/strapped to where it is not lying on the ground. 1/4" slope for every 1' is required and will be verified prior to final inspection. |