Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - LCEL - Electrical Progress
Permit Number - TC-UTL-1024-00091
Inspection Description - COT - LCEL - Electrical Progress
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/21/2025 | COT - LCEL - Electrical Progress | Re-inspection required | 3/21/25: called Roman Nunez, phone number: (520) 331-7340 no answer. Arrived on site waited 10min, no answer no access | |
| COT - LCEL - Electrical Progress | Re-inspection required | 7-21-25: not ready for finals. Contractor will work on TEP requirements, label breaker at panel, install address identification label and reschedule when ready. | ||
| 08/01/2025 | COT - LCEL - Electrical Progress | Not Ready | ||
| 08/22/2025 | COT - LCEL - Electrical Progress | Partial Pass | 8-22-25: Verified trench depth for a Schedule 80-3" electrical feeder conduit. Okay to backfill approximately 60' of open trench. |