Inspection History Details
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/10/2025 | BULD - Electrical Clearance | Re-inspection required | 10 FEB 2025 Not ready, contractor was not able to get a power kill. |
|
| 02/21/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 40A meter adapter - DGL clearance was called into TEP Pending solar |
|
| 02/27/2025 | BULD - Electrical Clearance | Passed | 2/27/25 approval for for TEP DGC |