Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/30/2025 | BULD - Electrical Clearance | Partial Pass | Installed per plans, grounding and labels per code 1/30/25 CLEARANCE DGC | |
| 02/05/2025 | BULD - Electrical Clearance | Canceled | 05 FEB 25 No response from contractor. |
|
| 02/10/2025 | BULD - Electrical Clearance | Re-inspection required | 10 FEB 2025 Not ready, contractor was not able to get a power kill. |
|
| 02/20/2025 | BULD - Electrical Clearance | Passed | 20 FEB 25 TEP CLEARANCE: DGC |