Inspection Status: Partial Pass

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
01/21/2025 BULD - Electrical Clearance Partial Pass Partial for the 200A service panel upgrade - INCR Clearance was called into TEP
Pending solar
02/05/2025 BULD - Electrical Clearance Canceled by Contractor
02/19/2025 BULD - Electrical Clearance Partial Pass Partial for the Tesla meter adapter - DGL Clearance was called into TEP at 10:35am
Pending solar
02/24/2025 BULD - Electrical Clearance Passed Approved solar and powerwall 3 installation - DGC/BAT clearance to TEP is required for the solar meter