Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/06/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter adapter - DGL Clearance was called into TEP at 9:05am Pending solar |
|
| 01/09/2025 | BULD - Electrical Clearance | Passed | Approved solar with battery - DGC/BAT Clearance to TEP is required for the solar meter |